Sunday, April 26, 2009

Bathroom Remodel - Final

The bathroom remodel is complete! Kirby really outdid himself here! He tore out the old shower, the flooring and the toilet. Installed polished travertine in the shower and around the existing tub. Then the glassmen came and installed the shower enclosure. He put the same travertine on the countertop and put in a new sink. Then he did new faucets for the shower, tub and sink. He painted the existing cabinets, put a shelf and electrical outlet under the "knee space" (useless space). I got a heat light over the shower. Then came the floor tile - more travertine but very different. Oh, and he hung the blinds. Final piece was the new potty. And of course he painted it all and put up new towel bars. What a project! He needs a rest now so I am giving him a couple of weeks off! (And NO! I do not loan him out!)

























And - just for fun - here is a picture of our spoiled mutt, Jake!





2 comments:

  1. This comment has been removed by the author.

    ReplyDelete
  2. Kirby that bathroom looks fabulous. I know you are happy to be done with that one. Now on to the next project!!!

    Ray

    ReplyDelete

Thank you taking a minute to comment on my blog! It means a lot to me!